System Notices

Silo/Hopper Down Tuesday, May 11, 2010 0900-1700 CST

Silo and Hopper will be down for routine maintenance on Tuesday, May 11, 2010 from 0900-1700 CST (Saskatoon time).  Regular maintenance, including firmware updates and GPFS updates, will be applied at this time.

Please contact support@westgrid.ca for any questions or concerns about this planned downtime.

 

UBC Orcinus - Chiller Maintenance Update

Please be advised that UBC Plant Ops has asked us to extend the chiller maintenance period by two additional days.  As a consequence, Orcinus will be open for regular operations on the following date:

   Saturday, May 1, late afternoon.

 

Calgary - Edmonton 10Gig Circuit Maintenance

TICKET INFORMATION:

Subject: Calgary - Edmonton 10Gig Circuit Maintenance
Category: Scheduled maintenance
Ticket ID: 20100417-001
Start Time: 2010-05-18 00:05 EDT (2010-05-18 04:05 UTC)
End Time: 2010-05-18 07:00 EDT (2010-05-18 11:00 UTC)

TICKET HISTORY:

== Updated: Damir on 2010-04-27 10:50 EDT(2010-04-27 14:50 UTC) ==

This maintenance has been rescheduled to May 18.

== Created: Malcolm on 2010-04-17 10:55 EDT(2010-04-17 14:55 UTC) ==

At the date and times listed circuit provider will be
performing a force
fiber relocate. This maintenance is only expected to
affected the circuit
briefly but the entire maintenance window is reserved.
The following lightpaths will be affected:
Core Edmonton - Calgary
Core Cal-Win
ECONET VCTR2-EDMN1
NRNet VCTR-EDMN
NRNet VCTR-SASK
Neptune300 VCTR-SASK
RDC EDMN1-CLGR2
SRNet back SASK-RGNA
TRIUMF UBC - UofA
WestGrid 10G Cal - Sas
WestGrid Cal - Edm

CANARIE NOC
Operations and Engineering
Email: eng@canarie.ca
Weekdays: 08:00-17:00 EDT(UTC-5)
+1.613.944.5612
7/24 pager: +1.613.944.5611
http://www.canarie.ca/canet4/

Apr 26, 18:45 (Pacific): Bugaboo available again

The Bugaboo upgrade has been completed and the cluster is available again.

Report problems to support@westgrid.ca

Apr. 26: Bugaboo Unavailable

Bugaboo will be unavailable basically all day on Monday, April 26. The shutdown is necessary to replace a recently failed controller and upgrade vital system software.

We hope that the system will become available again some time in the evening. All jobs that are still running at 9:00am (Pacific) will have to be terminated.

OC-192 Calgary - Edmonton

TICKET INFORMATION:

Subject: OC-192 Calgary - Edmonton
Category: Outage
Ticket ID: 20100420-001
Start Time: 2010-04-20 16:38 UTC (2010-04-20 16:38 UTC)
End Time: 2010-04-20 16:40 UTC (2010-04-20 16:40 UTC)

TICKET HISTORY:

== Updated: Damir on 2010-04-20 12:59 EDT(2010-04-20 16:59 UTC) ==

The start and end time were missing in the initial
posting of this ticket. Apologies.

== Created: Damir on 2010-04-20 12:54 EDT(2010-04-20 16:54 UTC) ==

OC-192 circuit Calgary - Edmonton went down briefly
during the noted time window. Circuit provider has been
informed and is investigating.
The following lightpaths were affected and unavailable:
CANARIE Edmonton - Calgary
CANARIE Cal-Win
ECONET VCTR2-EDMN1
NRNet VCTR-EDMN
NRNet VCTR-SASK
Neptune300 VCTR-SASK
RDC EDMN1-CLGR2
SRNet back SASK-RGNA
TRIUMF UBC - UofA
WestGrid 10G Cal - Sas
WestGrid Cal - Edm

CANARIE NOC
Operations and Engineering
Email: eng@canarie.ca
Weekdays: 08:00-17:00 EDT(UTC-5)
+1.613.944.5612
7/24 pager: +1.613.944.5611
http://www.canarie.ca/canet4/

OC-192 Calgary - Edmonton

TICKET INFORMATION:

Subject: OC-192 Calgary - Edmonton
Category: Outage
Ticket ID: 20100420-001
Start Time: 2010-04-20 00:00 UTC (2010-04-20 00:00 UTC)
End Time: 2010-04-20 00:00 UTC (2010-04-20 00:00 UTC)

== Created: Damir on 2010-04-20 12:54 EDT(2010-04-20 16:54 UTC) ==

OC-192 circuit Calgary - Edmonton went down briefly
during the noted time window. Circuit provider has been
informed and is investigating.
The following lightpaths were affected and unavailable:
CANARIE Edmonton - Calgary
CANARIE Cal-Win
ECONET VCTR2-EDMN1
NRNet VCTR-EDMN
NRNet VCTR-SASK
Neptune300 VCTR-SASK
RDC EDMN1-CLGR2
SRNet back SASK-RGNA
TRIUMF UBC - UofA
WestGrid 10G Cal - Sas
WestGrid Cal - Edm

CANARIE NOC
Operations and Engineering
Email: eng@canarie.ca
Weekdays: 08:00-17:00 EDT(UTC-5)
+1.613.944.5612
7/24 pager: +1.613.944.5611
http://www.canarie.ca/canet4/

Calgary - Edmonton 10Gig Circuit Maintenance

TICKET INFORMATION:

Subject: Calgary - Edmonton 10Gig Circuit Maintenance
Category: Scheduled maintenance
Ticket ID: 20100417-001
Start Time: 2010-05-04 00:05 EDT (2010-05-04 04:05 UTC)
End Time: 2010-05-04 07:00 EDT (2010-05-04 11:00 UTC)

== Created: Malcolm on 2010-04-17 10:55 EDT(2010-04-17 14:55 UTC) ==

At the date and times listed circuit provider will be performing a force
fiber relocate. This maintenance is only expected to affected the circuit
briefly but the entire maintenance window is reserved.
The following lightpaths will be affected:
Core Edmonton - Calgary
Core Cal-Win
ECONET VCTR2-EDMN1
NRNet VCTR-EDMN
NRNet VCTR-SASK
Neptune300 VCTR-SASK
RDC EDMN1-CLGR2
SRNet back SASK-RGNA
TRIUMF UBC - UofA
WestGrid 10G Cal - Sas
WestGrid Cal - Edm

CANARIE NOC
Operations and Engineering
Email: eng@canarie.ca
Weekdays: 08:00-17:00 EDT(UTC-5)
+1.613.944.5612
7/24 pager: +1.613.944.5611
http://www.canarie.ca/canet4/

UBC Orcinus - Chiller Maintenance (April 27-29)

Please be advised that we are going down for scheduled chiller maintenance during the following dates:

   April 27 - 7:30AM PDT until
   April 29 - 6:00PM PDT

To accommodate UBC Plant Operations, we will stop scheduling at midnight on April 27. Please adjust the walltime of your jobs accordingly.

Fri Apr 16, 14:30 (Pacific): Bugaboo available again

The problem with the /home /global/scratch filesystems have been resolved and Bugaboo is available again.
Syndicate content